Current FAST-41 Portfolio
The Permitting Council maintains an active portfolio of infrastructure projects that have obtained coverage under FAST-41. The list below details the FAST-41 projects currently receiving assistance from the Permitting Council for their federal permitting reviews.
FAST-41 provides projects with many benefits, including a coordinated permitting timetable and active project management by the Permitting Council’s Infrastructure Project Management (IPM) team. We have provided the contact information of the Permitting Council infrastructure project advisor dedicated to each project.
To view the full Permitting Project Dashboard click here.
Broadband
Project Title
Description
Permitting Primary Contact
(Planned) The Navajo Nation Department of Education proposes to deploy a reliable, affordable, scalable, and future-proofed broadband network...
(Planned) The Gallup McKinley County School proposes to deploy a reliable, affordable, scalable, and future-proofed broadband network...
The Pueblo Education Network builds middle mile broadband infrastructure for tribes, enabling digital economy participation...
The project will construct a multi-conduit, underground Fiber to the Premises (FTTP) system, more than 235 total miles...
Carbon Capture and Sequestration
(Planned) Pelican Renewables, LLC and its affiliates propose to develop a carbon sequestration hub on Rindge Tract, a large island in the Sacramento-San Joaquin River Delta...
Electricity Transmission
PacifiCorp, Bonneville Power Administration (BPA), and Idaho Power jointly propose to design, construct, operate and maintain a new 500 kilovolt...
Phase 1 of the Grain Belt Express (Project), a bi-directional high-voltage direct current (HVDC) transmission line spanning approximately 542 miles across Kansas and Missouri...
Mining
Project Title
Description
Permitting Primary Contact
A proposed zinc and manganese mining and processing operation in a historic mining district in Santa Cruz County, Arizona...
Ports and Waterways
Project Title
Description
Permitting Primary Contact
The proposed Sparrows Point Container Terminal (SPCT) project will be located on 330 acres within the existing Tradepoint Atlantic industrial development site...
Renewable Energy Production
Project Title
Description
Permitting Primary Contact
(Planned) Attentive Energy LLC proposes to develop an offshore renewable wind energy facility to generate 1,545 megawatts of energy...
An offshore renewable wind energy facility in Lease Area OCS-A 0549, which is approximately 7.8 statute miles (mi) (12.6 kilometers [km]) from the New Jersey (NJ) shoreline...
The purpose is to develop two offshore wind energy generation facilities in the Bureau of Ocean Energy Management (BOEM) Lease Area OCSA 0499...
(Planned) The Bay State Wind Offshore Wind Farm Project (the Project) proposes to construct up to 110 wind turbine generators...
Bonanza Solar, LLC proposes to construct, operate, and decommission a 300 MW solar photovoltaic and battery energy storage system electrical generation plant...
The purpose is to develop a commercial-scale, offshore wind energy facility in Commercial Lease OCS-A 0508 offshore North Carolina...
Kitty Hawk Wind, LLC proposes to construct, own, and operate the Kitty Hawk South Offshore Wind Project. The Project will be located...
US Wind is proposing the development and eventual decommissioning of the Maryland Offshore Wind Project...
(Planned) Pantheon Solar, LLC proposes to construct, operate, maintain, and eventually decommission a 400-megawatt (MW) solar photovoltaic facility...
Intersect Power proposes to construct, operate, maintain, and eventually decommission a 1,150 megawatt solar photovoltaic facility and battery energy storage system...
(Planned) Balanced Rock Power proposes to construct a 600-megawatt (MW), alternating current (AC) solar photovoltaic (PV) power generating facility...
The proposed 972-megawatt project would use the Bureau of Reclamation's existing Seminoe Reservoir on the North Platte River in Carbon County, Wyoming...
The Silver Star Solar 1 (project) would be entirely on land administered by the Bureau of Land Management (BLM)...
Skipjack Offshore Energy, LLC (SJOE) intends to develop, build, operate, and own an offshore wind farm located approximately 15 miles off the coast of Delaware...
The purpose of the SouthCoast Wind Project is to provide clean, renewable wind energy to the Northeast United States, including to Massachusetts...
The 600-megawatt (MW) Stagecoach Wind Project, once installed at full capacity, will be only the second and the largest wind generating facility in the State of Nevada...
(Planned) Vineyard Mid-Atlantic LLC proposes to develop, construct, and operate an offshore renewable wind energy facility...
Vineyard Northeast proposes to construct and operate the Project located in Lease Area OCS-A 0522, which covers approximately 132,370 acres...
The proposed 1,000-megawatt closed-loop project would be located in White Pine County, Nevada, and include the construction of two reservoirs...
Water Resources
Project Title
Description
Permitting Primary Contact
The purpose of the proposed Mid-Breton Sediment Diversion is to reconnect and re-establish the deltaic sediment deposition process between the Mississippi River...
Paused Projects
Beacon Wind proposes to construct and operate an offshore wind farm to be located approximately 20 statute miles south of Nantucket, Massachusetts...
Hilcorp Alaska, LLC proposes to construct a man-made gravel island in Foggy Island Bay, Beaufort Sea, Alaska...
Ocean Wind, LLC intends to construct, operate and maintain a commercial-scale offshore wind energy facility located approximately 15 miles off the coast of New Jersey...
Last Updated: Wednesday, December 11, 2024